Wednesday, March 31, 2010

Work to be done this Easter weekend...




Top photo shows the huge gouge on the bow, to be repaired Friday or Saturday. The second photo shows our wet/dry vacuum hose in the hole where a thru-hull blank was fitted. The fitting was leaking a touch so the wife and I decided to glass over the whole hole. The white is the tapered fiberglass ready to be epoxied. The third photo shows the hole before being prepped. Notice the water stain running down? We figured if water can run out when on the hard, then water can ingress when afloat. More pictures after the weekends work is done.


1 comment:

Skylark said...

What! On the hard for Easter... someone has been slacking off a bit. :) Good luck with your holes a fillin'. I am sure you will be happy with the results.